Commercial Heat Performance Review – Western Road, Stafford | New Homes Inspections
Commercial Case Study · Thermographic Survey

Heat Performance Review – Western Road, Stafford

How we uncovered critical heat loss, costed targeted fixes, and set a clear savings roadmap for a multi-room commercial facility.

FLIR E53 Thermography 86-page PDF Report Costed Action Plan 48-hour Turnaround

Project Overview

Inspection Date: 8 March 2025 · Location: Western Road, Stafford (ST18 0FB)

Beaconside Group commissioned New Homes Inspections to complete a full commercial heat performance review, targeting energy savings and occupant comfort improvements across several rooms.

  • Client: Beaconside Group (Ops Director: Phil Buckingham)
  • Objective: Identify heat loss, quantify impact, and provide costed solutions
  • Method: Thermography, observational checks, and room-by-room analysis
  • Deliverable: 86-page PDF with findings, solutions, and ROI guidance

At-a-Glance Outcomes

  • Primary loss: Windows with 10–13°C differentials → critical priority
  • Secondary: Thermal bridges at wall/ceiling junctions (5–8°C delta)
  • Operational: Uneven heat distribution & moderate air infiltration
  • Action plan: Quick wins + medium & long-term upgrades with payback

Key Findings

1) Window Heat Loss High

Significant 10–13°C temperature differentials across glazed areas indicated substantial conductive losses, with perimeter seals also contributing.

2) Thermal Bridging High

Linear anomalies at structural junctions consistent with insufficient insulation and missing thermal breaks.

3) Insulation Consistency Medium

Inconsistent surface temperatures across external walls and ceilings suggest localized gaps or compression in existing insulation layers.

4) Air Infiltration Medium

Localized cool spots at door frames, service penetrations, and skirtings indicate minor leakage paths adding to demand.

5) Heat Distribution

Uneven heat patterns due to suboptimal radiator placement and airflow blockages.

Costed Recommendations & Estimated Savings

Improvement Typical Cost Impact
Secondary glazing / perimeter sealing £1,200–£3,500 Window loss ↓ up to 75%
Thermal bridge remediation £650–£950 Junction losses ↓ 30–50%
Insulation top-ups £1,200–£2,800 Heat loss ↓ 25–40%
Smart heating controls & TRVs £175–£550 Efficiency ↑ 5–10%
Draught-proofing £220–£350 Infiltration ↓ 8–12%

Tip: Quick wins usually pay back in ~12–24 months at current tariffs.

Client Comment

“Andy from our Estates team met the surveyor on site and access was seamless. The report gives us a clear, costed roadmap to improve the building’s energy performance.”
— Phil Buckingham, Operations Director

How We Deliver Commercial Heat Performance Reviews

  1. Set-up & Access: Coordinate estates/facilities contact and heating profile.
  2. Thermography: Detailed room-by-room imaging and checks.
  3. Analysis: Diagnose fabric vs system; quantify differentials.
  4. Action Plan: Quick wins + medium and long-term measures.
  5. Handover: PDF report within 48 hours with photos and next steps.

Commercial Heat Survey — FAQs

How quickly will we get the report?

Within 48 hours in most cases, including full thermal imagery and actionable findings.

Will works disrupt operations?

Most quick wins are low-disruption; larger projects can be phased outside core hours.

Can you re-survey after fixes?

Yes, we can verify improvements and adjust your action plan accordingly.

Get In Touch

Bookings

Faq

Consultation

About Us

Surveyors

 

legal

Terms and Conditions

Complaints

new home ombudsman
Review Your Cart
0
Add Coupon Code
Subtotal