



Heat Performance Review – Western Road, Stafford
How we uncovered critical heat loss, costed targeted fixes, and set a clear savings roadmap for a multi-room commercial facility.
Project Overview
Inspection Date: 8 March 2025 · Location: Western Road, Stafford (ST18 0FB)
Beaconside Group commissioned New Homes Inspections to complete a full commercial heat performance review, targeting energy savings and occupant comfort improvements across several rooms.
- Client: Beaconside Group (Ops Director: Phil Buckingham)
- Objective: Identify heat loss, quantify impact, and provide costed solutions
- Method: Thermography, observational checks, and room-by-room analysis
- Deliverable: 86-page PDF with findings, solutions, and ROI guidance
At-a-Glance Outcomes
- Primary loss: Windows with 10–13°C differentials → critical priority
- Secondary: Thermal bridges at wall/ceiling junctions (5–8°C delta)
- Operational: Uneven heat distribution & moderate air infiltration
- Action plan: Quick wins + medium & long-term upgrades with payback
Key Findings
1) Window Heat Loss High
Significant 10–13°C temperature differentials across glazed areas indicated substantial conductive losses, with perimeter seals also contributing.
2) Thermal Bridging High
Linear anomalies at structural junctions consistent with insufficient insulation and missing thermal breaks.
3) Insulation Consistency Medium
Inconsistent surface temperatures across external walls and ceilings suggest localized gaps or compression in existing insulation layers.
4) Air Infiltration Medium
Localized cool spots at door frames, service penetrations, and skirtings indicate minor leakage paths adding to demand.
5) Heat Distribution
Uneven heat patterns due to suboptimal radiator placement and airflow blockages.
Costed Recommendations & Estimated Savings
Improvement | Typical Cost | Impact |
---|---|---|
Secondary glazing / perimeter sealing | £1,200–£3,500 | Window loss ↓ up to 75% |
Thermal bridge remediation | £650–£950 | Junction losses ↓ 30–50% |
Insulation top-ups | £1,200–£2,800 | Heat loss ↓ 25–40% |
Smart heating controls & TRVs | £175–£550 | Efficiency ↑ 5–10% |
Draught-proofing | £220–£350 | Infiltration ↓ 8–12% |
Tip: Quick wins usually pay back in ~12–24 months at current tariffs.
Client Comment
“Andy from our Estates team met the surveyor on site and access was seamless. The report gives us a clear, costed roadmap to improve the building’s energy performance.”
— Phil Buckingham, Operations Director
How We Deliver Commercial Heat Performance Reviews
- Set-up & Access: Coordinate estates/facilities contact and heating profile.
- Thermography: Detailed room-by-room imaging and checks.
- Analysis: Diagnose fabric vs system; quantify differentials.
- Action Plan: Quick wins + medium and long-term measures.
- Handover: PDF report within 48 hours with photos and next steps.
Commercial Heat Survey — FAQs
How quickly will we get the report?
Within 48 hours in most cases, including full thermal imagery and actionable findings.
Will works disrupt operations?
Most quick wins are low-disruption; larger projects can be phased outside core hours.
Can you re-survey after fixes?
Yes, we can verify improvements and adjust your action plan accordingly.
Useful Links
Explore these trusted resources to learn more about energy efficiency, building standards, and commercial property inspections:
-
Heat Loss & Thermographic Surveys
Discover our specialist surveys for commercial and residential properties.
-
Commercial Building Inspections
Comprehensive inspections for offices, warehouses, and retail sites.
-
Buckinghamshire Group
Industry leaders in property management and operational efficiency.
-
UK Government: Energy Efficiency Guidance
Official advice and standards for improving building performance.
-
Carbon Trust Resources
Insights, calculators, and support for energy-saving initiatives.
Get In Touch
legal
Terms and Conditions
Complaints